White Lake Excavating designed and constructed a retention pond to relieve a commercial development of an overwhelming amount of water run-off.
The main features of this project included:
WLE contracted with Dimensions Engineering to draw plans and get finale design approval from The Muskegon County Drain Commission. White Lake Excavating was able to utilize an unbuildable portion of the property under hi-tension power lines to construct the retention pond. White Lake Excavating conquered the complex challenge of utilizing a very limited work space and creating steep side-slopes.